柠檬导航

News

Demolition and construction work in progress at Otakaari 8

The lower part of Otakaari 8 building, also known as the ISS depot, will be demolished. The multi-storey car park on campus will be built in its place later.
Parking house
Illustration of the parking house. Illustration: Helin & co Architects Ltd.

Demolition work in progress and the lower part of the building will be demolished by the end of September. The site is fenced. In this first phase, pedestrian, cycle and driving routes are not affected by the site.

For the first time in campus history, a multi-storey car park will later be built in the area next to Maarintalo (S盲hk枚miehentie 3). This will ensure the parking spaces required by the building permits, and centralise vehicular traffic, leaving the land at the heart of the campus for other uses. Approximately 280 parking squares and a covered bicycle park are planned for the car park. In addition, charging stations for electric cars are designed. The estimated completion of the multi-storey car park is by the end of 2023.

Otakaari 8.jpeg

Demolition work in progress at Otakaari 8 plot.

More information: 
ACRE / Jarmo Wilander, Director, Construction Management
jarmo.wilander@aalto.fi

  • Updated:
  • Published:
Share
URL copied!

Read more news

A person holds two yellow magazines in front of a colourful exhibition with various posters and text panels.
Aalto Magazine Published:

Aalto University Magazine in search of hope

The new issue of Aalto University Magazine is out now. The magazine invites readers to reflect on where hope comes from in a time marked by uncertainty and rapid change.
Cafetoria pop-up in A Bloc
Campus, Cooperation Published:

A Bloc becomes a 鈥渓iving lab鈥 for Aalto students: Entrepreneurial Futures course and Cafetoria join forces in pop-up collaboration

A Bloc鈥檚 pop-up space turned into a hands-on learning environment when Entrepreneurial Futures course and Cafetoria co-created a pop-up.
Rainbow colours gradient on the left. Outi Elina Kansanen in an armchair on the right.
University Published:

Outi Elina Kansanen leaves room for imperfections

In the 100 words series, the Development Manager at the School of Electrical Engineering shares how she has promoted equality, diversity and inclusion at Aalto
People seated in rows of chairs in a room with grey walls and tiled floor, some wearing coats and jackets.
University Published:

Adaptive Reuse Seminar in Cambridge, UK

Two-day seminar in Cambridge on adaptive reuse of Downing Site, with student proposals, expert talks, and site visit.