ÄûÃʵ¼º½

News

Power outage impacted activities in Otaniemi 30 March

A power outage in the Otaniemi area impacts the following buildings: School of Chemical Engineering (Kemistintie 1), Nanotalo (Puumiehenkuja 2), Tietotie 1 and Vuorimiehentie 1

The repairs have finished and power returned at around 13. The problem, which began at around 12, was due to cut cable on a construction site.

There was a power outage in the Otaniemi area impacting the following buildings:  School of Chemical Engineering (Kemistintie 1), Nanotalo (Puumiehenkuja 2), Tietotie 1 and Vuorimiehentie 1.

The power outage impacted network connections on campus.

  • Updated:
  • Published:
Share
URL copied!

Read more news

Aalto Startup Center x A Grid Demo Day 2026
Campus, Cooperation Published:

Join us for Demo Day 2026 - March 4 at A Grid

On March 4th, A Grid is the place to be because Aalto Startup Center x A Grid Demo Day will be taking place.
On the left, a bright gradient in rainbow colours. On the right, a curly-haired person with a necklace and dark clothing.
University Published:

Anne Lähteenmäki believes that even a small gesture of acceptance builds trust

In the 100 words series, Anne Lähteenmäki, Professor of Radio Astronomy at the School of Electrical Engineering, shares how she has promoted equality, diversity and inclusion at Aalto
MyCourses activity
Incidents, Studies Published:
Researchers working in a laboratory.
Cooperation, Studies, University Published:

Join a Unite! matchmaking event on forging new consortia for Horizon Europe applications

Calling researchers and industry partners to connect at a virtual matchmaking session designed to spark project collaborations for Horizon Europe funding. Registration deadline, 12 March.