Show your work - book an exhibition space!
Practical information on how to organize an exhibition at Aalto premises.
Where would you like to sit down, which part of the campus needs garden benches? Leave your proposal!
Propose where new garden benches and different kinds of plants will be set up to the campus in spring 2022.
Colliding students and startups in A Grid’s Omnia Makerspace
Omnia Makerspace was launched in startup hub A Grid’s first floor opposite Restaurant Factory in April 2019. Since then, the space has evolved from an empty basement into a flourishing workspace where students and startups collide.
Two linden trees near Otaniementie to be renewed
The trees will soon be given a new life as decaying wood art.
Aalto University announces two art competitions for a campus block under construction
Proposals can be sent 4.1.-4.4.2022 for the competition open to all artists, arranged for the first time
Aalto University joins the City of Helsinki's new campus incubator programme
Helsinki wants to create a strong network of business incubators in the city in cooperation with higher education institutions.
Water supply renovation on campus starts with rock blasting
The water supply renovation site on Otakaari and Rakentajanaukio area starts with mining and blasting on Monday 10th January.
Maintenance work in Neo system on 22.3.2022
The Neo system provider will perform maintenance on our Neo site on Tuesday, March 22, 2022. The system will remain available during maintenance.
Maintenance work in Neo system on 8.2.2022
The Neo system provider will perform maintenance on our Neo site on Tuesday, February 8, 2022. The system will remain available during maintenance.
Challenges with Neo system
We have had some challenges with the approval workflow in Neo system this week.
Plastic and carton collection to every building on the campus
Waste sorting is changing on the campus at the beginning of the year 2022. Plastic and carton collection points will be added to break rooms.
Dipoli and Undergraduate Centre outdoor construction sites paused for winter
The work is to be completed by summer 2022.
Two new buildings to be built in the centre of Otaniemi campus
Building Otakaari 2A & 2B begins in January 2022, construction to be completed by summer 2023
Aalto in 2021: Super hearing, a greenhouse that’s actually green, prospective astronauts, and lots more
A second pandemic year hasn’t slowed Aalto down. Read about what our community has been up to in 2021 — and learn something new!
Entrepreneurial buzz, just a click away – virtual tour and other top picks from the Aalto startup community
The entrepreneurial and innovation ecosystem tour allows users to experience our university's entrepreneurial buzz from anywhere.